Mt. Fuji 2026: The Climbing Season Opens — New ¥4,000 Fee & Booking Rules
The season is opening now
The most-climbed mountain on earth has a short window. For 2026, the Yoshida and Subashiri trails open July 1, and the Fujinomiya and Gotemba trails — plus the summit — open July 10 (subject to last-minute snow-clearing). The season runs through early-to-mid September; outside it the trails, huts and water are closed and a climb is genuinely dangerous.

What's new in 2026: one fee, one rule for every trail
This is the big change. All four trails now charge a ¥4,000 entry fee per climber, and every climber must register and pay online in advance. The Yamanashi side (the Yoshida Trail) uses its own reservation website; the Shizuoka side (Fujinomiya, Gotemba, Subashiri) uses the 'Shizuoka Fuji Navi' app. You complete a short safety briefing as part of registration.
On the Yoshida Trail, the busiest route, two extra limits apply:
- A daily cap of 4,000 climbers — popular dates sell out, so book early.
- A gate cutoff in the afternoon: without a mountain-hut reservation you can't pass the 5th-station gate in the evening to attempt an overnight 'bullet climb'.
These rules exist to curb overcrowding, reckless overnight dashes and litter on the UNESCO-listed peak.
How to actually climb it
- Pick your trail. The Yoshida Trail from Fuji-Subaru Line 5th Station is the standard first-timer route — most huts, easiest access from Tokyo, descends on a separate path.
- Book a hut. A night at a 7th- or 8th-station hut breaks the climb in two and times your arrival for goraiko (sunrise from the summit). Huts book out for summer weekends well ahead.
- Register & pay the ¥4,000 on the correct site for your trail before you go; carry the confirmation.
- Don't bullet-climb. Going up and down in one night without sleep is how people get altitude sickness and hypothermia — and the new gate rules now discourage it.
Getting there
From Tokyo, direct highway buses run from Shinjuku Expressway Bus Terminal to the Fuji-Subaru Line 5th Station in peak season (about 2.5 hours); otherwise train to Kawaguchiko Station and bus up. The 5th station sits at 2,300 m, so even the start is cool — pack layers, rain gear, a headlamp and cash for the huts.
Bottom line
Fuji in 2026 is more regulated but better managed: a ¥4,000 fee, a compulsory online booking, a 4,000-a-day cap on Yoshida, and a real push against sleepless bullet climbs. Sort the registration and a hut first, climb to meet the sunrise, and it's still one of the great things you can do in a Japanese summer.
Todos los eventos
Mount Fuji Climbing Season
Climb Japan's iconic 3,776m peak during the official summer season and watch the sunrise from the roof of Japan.
2026/06/30 15:00 Por todo JapónA trail-entry fee applies (around 2,000-4,000 yen); mountain-hut stays extra
© Hao Chou · GoogleFuji Rock Festival 2026
El mayor festival de música al aire libre de Japón se despliega por una estación de esquí entre montañas brumosas, con cabezas de cartel internacionales en once escenarios entre bosques.
2026/07/24 TokioAbono de 3 días aprox. ¥60,000 / 1 día aprox. ¥24,000
© 苗場プリンスホテル · GoogleHakone Hot Springs & Open-Air Museum
A mountain hot-spring resort near Mt. Fuji, combining steaming onsen, a sculpture park, a pirate-ship lake cruise and ropeway views.
2026/07/04 Por todo JapónOnsen and museum entries vary; a Hakone Free Pass saves on transport
© Suicasmo · CC BY-SA 4.0